Get Social With Us:  

412.322.8340 | info@cdrbridges.com

 

Contractors

Role Contractor1 CDR Bridge System

WHEN EVERY DAY AND EVERY DOLLAR COUNTS

The bottom line is important. The Folded Steel Plate Girder is cost competitive with other accelerated bridge techniques, as well as conventional construction options. Benefits and savings are derived from a variety of features that facilitate and accelerate construction.

OPEN BROCHURE

THE BENEFITS OF FSPGS FOR CONTRACTORS

Reduce field labor by fabricating and precasting in a shop environment

Bridge erection is easier and faster because FSPG™ does not require intermediate stiffeners or cross frames

FSPG™ 1/3 the weight of concrete beams and lighter than a typical steel stringer system

Lighter weight and stability allows for use of smaller capacity cranes

Reduce hauling permits with lighter shipping weights and length

Contact Us

[]
1
Nameyour full name
CompanyCompany name
Message
0 /

Response will be within 72 hours.

Previous
Next
ABOUT THE FSPG™ AND HOW YOUR PROJECT CAN BENEFIT.