Get Social With Us:  

412.322.8340 | info@cdrbridges.com

 

Owners & Engineers

Role Owner CDR Bridge System

AN ECONOMICAL ALTERNATIVE TO SHORT-SPAN BRIDGE CONSTRUCTION

Owner’s save money both in construction and overall life cycle cost. The Folded Steel Plate Girder is cost competitive with other accelerated bridge techniques, as well as conventional construction options. Benefit in both the short- and long-term with a variety of features.

OPEN BROCHURE

THE BENEFITS OF FSPG™ FOR OWNERS AND ENGINEERS

The faster construction times of FSPG™ means less disruption to traffic and inconvenience to the public

The FSPG™ is designed for 100 years of service life

FSPG™ requires less maintenance because of fewer fatigue prone details and less hardware in its jointless design, especially when weathering or galvanizing the steel

The simplicity of FSPG™ makes it easier to inspect

FSPG™ is more versatile because it can be installed on any type of substructure, with or without an approach slab

The lighter weight of FSPG™ increases the possibility of reusing existing substructures

COMPETITIVE INITIAL COSTS

LOWER MAINTENANCE COSTS

LONGER SERVICE LIFE

LOWER LIFE CYCLE COSTS

Contact Us

[]
1
Nameyour full name
CompanyCompany name
Message
0 /

Response will be within 72 hours.

Previous
Next
ABOUT THE FSPG™ AND HOW YOUR PROJECT CAN BENEFIT.